Current News

RFP 2017-22 Sunshine Coast Regional Airport Expansion

Posted: 91 days ago

ADDENDUM #1 - August 24, 2017 - Clarification of work included in attachment

ADDENDUM #2 - August 30, 2017 - Changes to work required. Updated documents - attached addendum #2

The District of Sechelt wishes to expand the existing Sunshine Coast Regional Airport runway with the addition of a clearway. The required works are a 200 m clearway and the proponent will be required to perform all necessary works, including the following:

  • Clear and Grubbing the required area
  • Stripping the designated area
  • Stockpiling organics
  • Performing the required Cut and Fill
  • Import and placement of granular materials in 0.15m lifts, as required